krol-17

The Alaska Railroad crew aboard train 125N is seen backloading the CN-bound barge at the Port of Whittier with GP40-2s 3012, 3006 and GP38-2 2004 doing the honors. The trio of flat car spacer/idler cars can be seen with snow cover behind the power as can cars being loaded onto the single level barge. 3/12/17

 
Photo courtesy of Kevin Burkholder