Repainting the Power


What a great job, to take something old and make it look brand new again! And who would know better than the meticulous nine-man crew at Wisconsin Southern Railroad’s Horicon paint shop.
In 2006, the Alaska Railroad decided it was time to repaint GP40 numbers 3002, 3004 and 3005 (using the new paint scheme) and thus put out a request for bids. Although NRE at Dixmoor, Illinois was the winner, they became overbooked and deferred to the boys at Horicon.

Before work can begin, some initial tasks must take place. Engineering drawings are sent, paint and vinyl decals are ordered and the work is scheduled. Finally, the locomotives are sent from Alaska, first via barge from Whittier to Seattle and then via train from Seattle to Horicon.

In May 2007 the Horicon magicians went to work to make our ladies sparkle again. The first stop is the Washout Facility where the unit receives a degreaser and a good steam cleaning. Hostlers then move the locomotive to the Paint Shop Facility.

First, the old paint is removed by brush blasting the units with coal slag. The slag is preferred since it does not cause respiratory problems. Once this is complete, the unit moves further into the facility to receive exterior bodywork. All dings, dents and other imperfections are covered with a fast drying bondo and then sanded smooth. Workers also remove components that do not require painting such as number boards, crew seats, etc.

Now the painting process begins. The trucks are painted first and they receive a coat of shiny silver paint. Next, is the application of epoxy primer. However, before this can be applied, all areas not requiring primer must be covered. The trucks and couplers are covered in plastic sheeting while the windows and control stand are covered with paper and special masking tape. While the primer is being mixed and paint hoses are laid out, the other half of the team is donning respirators, cloth ski masks and plastic hooded body suits. Primer is first applied to the top of the locomotive and finally to the body from the bottom up. The cab interior and inside of the motor cabinets now receive a coat of beige paint.

Next vibrant yellow is applied to the front, steps, sill, handrails and mid-body. Black paint is then shot on the fuel tank and underbody. Once this is completely dry, it is time for a major masking party. Four workers mask off the areas that need to remain untouched by the future spraying of blue paint. Another worker masks off the area for the long blue stripe. Adhesive stencils for the unit name and the giant “Alaska” are then applied to each side. Finally, the brilliant blue paint is sprayed and the stencils are removed.

Now just a few details remain. A large ARR vinyl logo is applied to the nose and all seats, number boards, etc are re-installed. Finally, a clear coat is applied over all the blue and yellow paint to increase its longevity and give it a beautiful shine. Now our ladies are ready to return home.

A few foot notes:

Although the above commentary implies a single assembly line process, in actually two or three locomotives are worked on simultaneously in the facility. For example, on the first day I was there, one half of the crew sprayed primer on #3002 while the other half masked off #3005.

The cost to paint a locomotive is in the range of $10,000-$40,000 and 300-400 man-hours. Cost and labor varies with type of paint, size of locomotive and complexity of the artwork.

Many thanks goes to John Smet, Sales Manager of the Car and Paint Shop, and his management at the Wisconsin Southern Railroad for allowing me to spend two days on site learning about this process and meeting the fine folks at the paint shop. I must admit I was very impressed by the hard work and focus of the paint crew. Thanks also to the Alaska Railroad for giving me permission to photograph their locomotives at the Horicon paint shop.

 

image image image image
Wisconsin and Southern's facilities Locomotive getting cleaned in Washout Facility Paint Facility built in 1994 - "Quality Covers It All" Black is sprayed on underbody and fuel tank
image image image image
Interior is masked off to prepare for beige paint All imperfections are identified and repaired Fast drying bondo is applied to dents and dings After ten minutes the bondo can be sanded smooth
image image image image
GP40 number 3002 gets a minor facelift All dust is removed prior to spraying with primer Workers don suits & respirators and begin applying primer All primer has been applied and is ready for yellow
image image image image
Painters masking tape is used to section off yellow areas Special paper is used for masking such as found on these handrails Special blue tape is used where curves are defined Stencil has been applied and number masking pulled off
image image image image
Alaska stencil in place and letters pulled off The front is masked using paper, plastic and tape Final sanding to help paint adhere to the surface Trackmobile used to move locomotive into paint room
image image image image
Good view of rear masking and prep work All dusted is removed prior to spraying blue Top is painted first then the body from back to front Fine blue paint mist is in the air; body almost complete
image      
Now painting the cab exterior and nose      

And the magic is complete: